General Service Small Time-of-Use — Schedule GSSTOU-10
Printable version in PDF format
Availability:
All qualified customers in the area served by the Cooperative.
Applicability:
To all electric customers with a measured load of less than 25 kW service of one standard voltage, required on the customer's premises, delivered at one point and metered at or compensated to that voltage. This required condition must be met for twelve (12) continuous billing months prior to customer being placed on this tariff. No service rendered hereunder may be resold, nor transmitted to other premises, either directly or indirectly, without the express consent of the Cooperative.
Monthly Rate:
| Service Charge | @ | $20.00 (Single phase customers) | ||
| $35.00 (Three phase customers) | ||||
| Energy Charges | ||||
| All On Peak kWh | @ | 37.28¢ per kWh | ||
| All Off Peak kWh | @ | 7.99¢ per kWh | ||
Wholesale Cost Adjustment
The bill calculated at the above rate shall be increased or decreased subject to the provisions of the Cooperative's wholesale cost adjustment Schedule P.
Terms of Payment:
If the account is not paid by the due date, a late fee in the amount specified in the Service Rules and Regulations may be added to the account. Further failure to pay a bill may subject a customer to disconnection and/or disconnection charges in accordance with the Cooperative's rules and regulations.
All charges are subject to applicable taxes.
Determination of On-Peak And Off-Peak Energy:
On-Peak Energy shall be all kWh used during the on-peak period.
Off-Peak energy shall be all kWh used during the off-peak period.
Definition of Time Periods:
The on-peak time period shall be the hours from 4:00 p.m. to 8:00 p.m., Monday through Friday, for the calendar months of June through September, excluding the days on which the Independence Day and Labor Day holidays are observed.
The off-peak time period shall be the hours not defined above as on peak. Off-peak hours shall include all weekend hours and all hours during the months of October through May.
Reactive Demand:
Where there is an indication of power factor of less then 95% lagging, the Cooperative may, at its option, install metering equipment to measure Reactive Demand. The reactive Demand shall be the highest 60-minute kVAR measured during the month. The Excess Reactive Demand shall be kVAR which is in excess of one-third the measured actual kW in the current. The Cooperative will bill excess kVAR at the rate of $0.30 per excess kVAR
Minimum Monthly Charge:
The minimum monthly charge shall be one of the following options, whichever is greater:
- In no case shall the minimum bill be less than $20.00 per month for single-phase customers or $35.00 for three phase customers.
- The charge as may be specified in a supplemental contract.
Contract Period: One year.
Apply for Service | Media Center | Storm Center | Careers | Search | Contact Us | Home
Copyright © 1998-2010, Jackson Electric Membership Corporation | Legal and Privacy Notices
